• Your selection is empty.

    Register the diplomas, courses or lessons of your choice.

System control project

  • School / Prep

    ENSEIRB-MATMECA

Internal code

ES7AU212

Description

The aim is to apply the principles and methods studied in class to real systems.
5 Practical work:
1 - Control of a pneumatic system using a TSX 47 PLC(Moving a metal part on a bench using pneumatic cylinders and a conveyor belt)2 - Control of an elevator using a TSX 47 PLC(TSX 47 PLC and elevator model)3 - Implementation of an assembly line(FESTO FEC 640/660 PLC : programming the distribution or assembly module)4 - Closed-loop PID control of an electromechanical system(Speed-controlled DC motor)5 - Closed-loop PID control of a time-delay system(Temperature-controlled thermal enclosure)

Read more

Teaching hours

  • CIIntegrated Courses20h

Syllabus

The aim is to apply the principles and methods studied in class to real systems.
5 Practical work:
1 - Control of a pneumatic system using a TSX 47 PLC(Moving a metal part on a bench using pneumatic cylinders and a conveyor belt)2 - Control of an elevator using a TSX 47 PLC(TSX 47 PLC and elevator model)3 - Implementation of an assembly line(FESTO FEC 640/660 PLC : programming the distribution or assembly module)4 - Closed-loop PID control of an electromechanical system(Speed-controlled DC motor)5 - Closed-loop PID control of a time-delay system(Temperature-controlled thermal enclosure)

Read more

Further information

Automatic

Read more

Assessment of knowledge

Initial assessment / Main session - Tests

Type of assessmentType of testDuration (in minutes)Number of testsTest coefficientEliminatory mark in the testRemarks
Integral Continuous ControlMinutes1